Getting the steel
building, building permits
In order to get permits you will need to prove a few things:
Are there similar buildings in the area, if there
are you will probably be able to get permission to build a similar steel
building.
You will also need to prove that the steel building is structurally sound. Each
city and county will have its own requirements. To prove that the
building is sound you
must get a certified, stamped engineered blueprint from the company you
plan on buying the building from. The signature must be from a licensed
engineer who is licensed in the state where your building will be
located. When talking with your salesman specify the building state to
him or her.
A lot of times in zoning in suburban and city areas is based on
appearance and size of the building. The local zoning officials for your
area will generally restrict the overall size of your building and the
outside appearance of the building including its shape. Typically the
odd shaped buildings are harder to get permits for.
Getting permits before you buy is a very important step. Most people
don't think about this until they need permits. Maybe if you are in a
rural area of the United States this may not be a problem for you.
However if you plan to put a building in the city you'll want to pay
close attention to the permits
A guide on how to buy a steel building
What types of foundation to use?
Anchoring your building
Metal building dictionary and trade terminology
Search our articles for information
|